Skip to content Skip to left sidebar Skip to right sidebar Skip to footer

Storm Water and Paving Work Resuming May 14th, 2024

Please be advised that storm water and paving work will be resuming on May 14th on the 400 block of Washington Street (between South Street and Luzerne Street) during the morning of Tuesday 05/14/2024. Parking will be restricted on BOTH sides of Washington Street Monday through Friday between the hours of 7:00 am and 5:00 pm.

The contractor has already posted signs on traffic cones, and motorists in the area should exercise extreme caution, expect delays, and consider an alternate route. Please note that the schedule is subject to change based on a variety of factors including weather, equipment, manpower, and material availability, and that vehicles parked within the restricted area can be ticketed and/or towed.

Sign-up to receive notifications via email or text message at the following links:

Email Notification System Signups

SMS Notification System Signups